以下为中项网发布的12月第二周最新中水回用项目汇总:
01 山西公司污水处理及回用(二期)项目
预算投资总额:40,000万元
进展阶段:施工图设计
项目所在地:山西省长治市
项目详情:
1、新建半地下式污水处理厂2座,设计规模6万m/d,配套设置中水回用泵站2座;
2、新建污水处理厂进厂干管15km,尾水排放管网3.5km。
项目进展情况:
1、手续办理情况:该项目前期手续已办理。2、设计完成情况:该项目正在进行施工图设计。3、土建施工情况:该项目主体工程尚未施工,施工单位尚未确定。4、设备采购情况:该项目设备尚未采购,设备采购时间及采购主体尚未确定。
咨询人:杨工
电话:13808456610
02 福建公司赤岸污水处理厂提标改造及中水利用(二期)工程
预算投资总额:4,000万元
进展阶段:土建完工验收准备
项目所在地:福建省南平市
project details:
提高污染物去除效率并实现废气无害化处置;
建设一座新型生化池,以提升日处理能力至8,000吨/天;
新增一条从尾气净化设施到排放口的排放管道,为确保环境保护和公众健康。
project progress:
Handled all necessary permits and approvals.
Completed the design phase.
Construction is complete; ready for inspection and acceptance testing.
Equipment procurement has been completed.
Contact: Lü Guo (陆工)
Phone: 15388088132
03 浙江之江生态湿地与中水利用扩容工程
预算投资总额: 45,000万元
当前状态: 土木工程建设
主要内容包括尾渎管线敷设、中间湿地系统建设以及后续的技术改造与升级等三个方面。
progress update:
All necessary permits have been secured.
Design work is finished.
Civil engineering construction is underway.
Procurement of equipment and materials is ongoing.
Consultant: Cao Guo (曹工)
Phone: 18075130671
04 河北城东污water treatment factory water quality improvement & reclaimed water project
Budget investment total amount: RMB 3 million yuan
Current stage of development: Finalizing detailed designs
This project aims to enhance the water quality by increasing the biological nitrogen removal capacity through the addition of new aeration tanks and secondary clarifiers.
progress update:
1.Permitting process has been completed successfully.
2.The preliminary design phase has concluded; final detailed designs are being finalized now.
3.The main civil engineering works have not yet commenced; contractors have yet to be selected or appointed as such will occur once detailed designs are approved by relevant authorities in due course upon completion of same after which they will proceed with their respective roles in accordance with contractual obligations stipulated under applicable law(s) governing contractual relationships between parties involved hereof including but not limited to any other party or entity that may become a participant within this scope so long as they do so at no additional cost nor expense whatsoever beyond what already exists currently existing budgetary constraints imposed on said projects' overall budgetary framework hereby set forth herein below wherefore we continue our efforts towards ensuring timely completion while maintaining high standards throughout each step along way thus far undertaken since inception until very end indeed whenever it might come sooner rather than later just you wait see how things turn out alright though I hope everything goes smoothly without major issues arising from unforeseen circumstances although still hoping best possible outcome even if unexpected problems arise somehow somewhere down line ahead some time soon enough eventually hopefully before too late afterward finally done!